• Feedback
  • RSS Feed
  • Sitemap
Ommcom News
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Nation

Mumbai-Ahmedabad Bullet Train Witnessing Steady Progress: Ashwini Vaishnaw

OMMCOM NEWS by OMMCOM NEWS
January 19, 2026
in Nation

New Delhi: Railways Minister Ashwini Vaishnaw on Monday said that the Mumbai-Ahmedabad Bullet Train project is witnessing steady progress with the installation of Overhead Electrification (OHE) masts advancing along the corridor.

According to the minister, the development marks an important step towards enabling electric traction for India’s first high-speed rail system and reflects consistent on-ground execution under the ‘Make in India’ initiative.

In doing so, it strengthens domestic manufacturing capabilities while adopting globally proven high-speed rail technology, he added.

Vaishnaw further stated that the installation of OHE masts is underway across key sections of the alignment, including viaduct stretches, to support safe, smooth and efficient high-speed train operations.

These masts form a critical part of the traction infrastructure required for reliable power supply to bullet trains running on the corridor.

The OHE masts are being installed on elevated viaducts at significant heights above ground level. In total, more than 20,000 masts, ranging from 9.5 to 14.5 metres, will be installed along the corridor.

The masts will support the complete 2×25 kV overhead traction power system, including overhead wires, earthing arrangements, fittings, and other accessories required for bullet train operations.

To ensure uninterrupted traction power, a network of Traction Substations (TSS) and Distribution Substations (DSS) is being developed along the Mumbai–Ahmedabad High Speed Rail corridor.

Once completed, the Mumbai–Ahmedabad Bullet Train will make travel between the two cities faster and more convenient, while improving connectivity across the corridor.

According to the minister, the project is expected to benefit passengers, local economies, and Indian industry through job creation and strengthened manufacturing.

It also marks an important step towards the adoption of advanced rail technology and the development of world-class rail infrastructure in the country.

(IANS)

Tags: Ashwini Vaishnaw
ShareTweetSendSharePinShareSend
Previous Post

EU To Hold Emergency Summit On Thursday Over Trump’s Greenland Threats

Next Post

Sabarimala Gold Heist: Kerala HC Says It Appears To Be Planned Plunder

Related Posts

Nation

TN Chief Minister Vijay Pays Homage To Legendary Tamil Film Director Bharathiraja

June 10, 2026
Nation

From Abrogating Article 370 To Giving Befitting Reply To Terrorism: Amit Shah, Nitin Nabin List ‘Historic Achievements’ Of Modi Govt

June 10, 2026
Nation

Service To People Is Ultimate Test Of Good Governance: PM Modi

June 10, 2026
Prime Minister Narendra Modi
Nation

Ministers Hail PM Modi As He Completes 4,399 Days, Sets Tenure Record

June 10, 2026
Blast
Nation

Two Soldiers Killed In Accidental Blast Near LoC In Uri

June 10, 2026
Nation

‘Tenure Reflects Unwavering Dedication’: Rajnath Singh As PM Modi Becomes India’s Longest Serving Elected PM

June 10, 2026
Next Post
Kerala High Court

Sabarimala Gold Heist: Kerala HC Says It Appears To Be Planned Plunder

Vadodara: Royal Challengers Bengaluru's Richa Ghosh and Gautami Naik celebrate their partnership during the Women's Premier League 2026 match between Gujarat Giants Women and Royal Challengers Bengaluru Women at BCA Stadium, Kotambi in Vadodara district of Gujarat on Monday, January 19, 2026. (Photo: IANS)

WPL 2026: Gautami Naik's Maiden Fifty And A Late Blitz From Bowlers Help RCB Post 178/6

Govt's 2-Day 'Chintin Shivir' Begins, Aims To Build Modern, Competitive & Inclusive Food Processing Sector

Khimji
CUTM
SAI
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special

© 2025 - Ommcom News. All Rights Reserved.