• Feedback
  • RSS Feed
  • Sitemap
Ommcom News
Advertisement
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Nation

Indian Railways Unveils Design Of India’s 1st Bullet Train For Mumbai-Ahmedabad Corridor

OMMCOM NEWS by OMMCOM NEWS
May 18, 2026
in Nation

New Delhi: Indian Railways on Monday unveiled the design of India’s first bullet train, which will operate on the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor.

The Ministry of Railways showcased an image of the proposed bullet train at its office in New Delhi. In a statement, the ministry said, “A picture of the country’s first proposed bullet train has been displayed at the Ministry of Railways. The picture has been installed at Gate Number 4.”

Earlier in February, Railway Minister Ashwini Vaishnaw informed the Lok Sabha that the 508-km Mumbai-Ahmedabad High-Speed Rail corridor will pass through Maharashtra, Gujarat and the Union Territory of Dadra and Nagar Haveli and Daman and Diu.

The corridor will include 12 stations — Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati.

According to the ministry, foundation work has already been completed at eight stations in Gujarat, including Vapi, Bilimora, Surat, Bharuch, Anand, Vadodara, Ahmedabad and Sabarmati.

Construction work is currently underway at Thane, Virar and Boisar in Maharashtra, while excavation work at the Bandra Kurla Complex (BKC) station is nearing completion.

The project has also made significant progress on bridge infrastructure. Seventeen river bridges have already been completed, while work continues on four major bridges in Gujarat over the Narmada, Mahi, Tapti and Sabarmati rivers. In Maharashtra, construction is underway on four additional river bridges.

At the underground BKC station, excavation work is around 91 per cent complete. The 4.8-km under-sea tunnel section between Ghansoli and Shilphata has also been constructed.

The MAHSR project is being developed under the government’s Make in India initiative, with Integral Coach Factory in Chennai and BEML Limited in Bengaluru jointly developing train sets capable of achieving a design speed of 280 kmph.

Vaishnaw had earlier stated that the entire 1,389.5 hectares of land required for the project has been acquired in accordance with applicable laws.

Compensation has been provided to affected families under state laws and the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act.

The government said rehabilitation and resettlement measures were undertaken in coordination with the governments of Gujarat and Maharashtra, along with additional benefits and solatium for affected people.

(IANS)

ShareTweetSendSharePinShareSend
Previous Post

3 Orissa HC Judges Cycle To Court, Promote Fuel Conservation

Next Post

CM Fadnavis Expresses Grief Over Fatal Mumbai-Ahmedabad Highway Crash; Announces Rs 5 Lakh Aid

Related Posts

Nation

Rahul Gandhi Mourns Chennamma, Offers Condolences To Deve Gowda Family

July 18, 2026
Nation

Kumaraswamy Pays Tribute To Mother Chennamma; Final Rites On July 20

July 18, 2026
Nation

J&K: Amarnath Yatra Suspended From July 19 Due To Weather

July 18, 2026
Nation

NCTE Launches Probe Into Suspicious BED Colleges

July 18, 2026
Nation

Bihar: Itadhi Crossing Protest Intensifies In Buxar; Rail Blockade Foiled

July 18, 2026
Nation

Gujarat: Ahmedabad Firecracker Factory Blast Death Toll Rises To Nine

July 18, 2026
Next Post

CM Fadnavis Expresses Grief Over Fatal Mumbai-Ahmedabad Highway Crash; Announces Rs 5 Lakh Aid

‘Coffees Of Nagaland’ Is Truly A Whole Of India Approach Bringing All Stakeholders Together: Scindia

vinesh-phogat

Delhi HC Declines Immediate Relief To Vinesh Phogat Over Asian Games Trials

Khimji
SAI
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special

© 2025 - Ommcom News. All Rights Reserved.