• Feedback
  • RSS Feed
  • Sitemap
Ommcom News
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Nation

Uttarkashi Tunnel Collapse: Up To 30 Metres Vertical Drilling Completed, Broken Parts Of Auger Machine Removed

OMMCOM NEWS by OMMCOM NEWS
November 27, 2023
in Nation

Uttarkashi: Sixteen days have passed since the Silkyara tunnel accident took place in Uttarakhand’s Uttarkashi, but no visible success has been achieved as several agencies with 200 employees continue rescue operations to bring out 41 workers trapped in the tunnel.

After repeated interruptions in the auger machine, vertical drilling work has been started from the top of the hill from Sunday. And till now drilling up to 30 meters has been completed.

Meanwhile, in a positive development, broken parts of the auger machine have been taken out. Now manual drilling work will be started here, which will proceed under the supervision of the engineering group of the Indian Army, Madras Sappers.

The rat hole mining technique will be adopted for manual drilling, in which small tunnels are dug. Such tunnels are made in coal mines.

Former PMO advisor Bhaskar Khulbe and PMO Deputy Secretary Mangesh Ghildiyal have reached the Silkyara tunnel site to take stock of the situation. General VK Singh (retired) also reached the site where he offered prayers in the temple of Baba Bokh Naag Devta built outside the tunnel.

Two days ago, the Meteorological Department had issued a yellow alert for three days. Light snowfall has also started in Uttarkashi, which may hamper the rescue operation.

Recently, Chief Minister Pushkar Singh Dhami met the family of Pushkar Singh Airi, a worker from Tanakpur, who is one of the 41 workers trapped in the tunnel. During the meeting, Dhami consoled the family members. He also said that the rescue work will be completed soon and all the workers will come out soon.

 (IANS)

Tags: Uttarkashi Tunnel Collapse
ShareTweetSendSharePinShareSend
Previous Post

Three Elephants Die Of Goods Train Collision In North Bengal

Next Post

IPL: Hardik Pandya Traded To Mumbai Indians From Gujarat Titans; Cameron Green Traded To RCB From MI

Related Posts

Nation

Arunachal CM Calls For Collective Fight Against ‘Money Culture’ In Elections

August 18, 2025
Nation

Rs 6,487 Crore Sanctioned So Far For Electrification Of 13.59 Lakh Households

August 18, 2025
Nation

‘US Must Rethink India As Ally Not Competitor’

August 18, 2025
Nation

‘Tan Samarpit, Man Samarpit’ Is An Answer To Those Who Malign RSS: Indresh Kumar

August 18, 2025
Nation

Minority Educational Institutions Bill New Step To Divert People From Core Problems: Uttarakhand Ex-CM Rawat

August 18, 2025
Nation

Flood Warning Issued For 11 Delta Districts Of TN As Mettur Dam Nears Full Capacity

August 18, 2025
Next Post

IPL: Hardik Pandya Traded To Mumbai Indians From Gujarat Titans; Cameron Green Traded To RCB From MI

Shubman Gill Appointed Captain Of Gujarat Titans Following Hardik Pandya’s Move To Mumbai Indians

War Against Terrorism Will Continue Till Last Terrorist Accepts Defeat: J&K DGP

khimji
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ

© 2025 - Ommcom News. All Rights Reserved.