• Feedback
  • RSS Feed
  • Sitemap
Ommcom News
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Odisha

East Coast Railway Embarks on Ambitious Solar Power Project

OMMCOM NEWS by OMMCOM NEWS
August 7, 2024
in Odisha
East Coast Railway

Bhubaneswar: In a bid to generate more green energy and reduce its carbon footprint, the East Coast Railway (ECoR) is set to install rooftop solar power plants across its jurisdiction.

The project aims to harness 21,826 KWp capacity solar energy, resulting in estimated savings of Rs 14 crores from energy bills and Rs 91.41 lakh from carbon credits.

The initiative will see the installation of solar power plants at 149 station buildings, 248 service buildings, 6,924 residential buildings, and 366 level crossing gates. Out of the above, tenders have been floated for Rs 83.79 Crores, which includes Solar Power Plants/Renewable Solar Energy Sources on grid plants of different capacities on rooftops and shed tops in various locations:

  • Brahmapur-Palasa Railway Section at a cost of Rs 9.13 cr
  • Bhubaneswar-Cuttack-Paradeep-Bhadrak Railway section Rs 8.86 cr
  • Angul Section Rs 9.48 cr
  • Headquarters area in Bhubaneswar Rs 9.10 cr
  • Khurda Road-Puri Section Rs 8.74 cr
  • Paradeep-Kendujhargarh Railway Section Rs 8.10 cr
  • Visakhapatnam area Rs 7.25 cr
  • Visakhapatnam Electric Loco Shed area Rs 7.10 cr
  • Duvvada-Palasa Main Line/Naupada-Gunupur/Vizianagaram-Rayagada area Rs 8.78 cr
  • Kottavalasa-Kirandul Rail Line Section Rs 7.53 cr

Major Station Buildings and Service Buildings like Headquarters Building, Rail Sadan at Chandrasekharpur, 6790 KWp have also been provided with Rooftop Solar Power Plants/Renewable Energy sources. Level Crossing Gates at most of the places in ECoR jurisdiction have also been installed with Solar/Renewable Energy Systems.

Tags: East Coast RailwaySolar Power Project
ShareTweetSendSharePinShareSend
Previous Post

3-Tier Tripura Panchayat Polls On Aug 8 After BJP Won 70 Pc Seats Unopposed

Next Post

Diarrhoea Cases Surge In Kalahandi Village

Related Posts

Breaking News

Chief Secy Reviews PMGSY Projects In Odisha, Emphasizes Quality Construction

July 8, 2025
Odisha

One Killed, Another Injured In Hit-And-Run Accident In Keonjhar

July 8, 2025
Odisha

Satya Priya Rath Appointed Managing Director Of GRIDCO

July 9, 2025
Odisha

Maoist Camp Busted In Nuapada; Explosives Recovered By DVF

July 8, 2025
Odisha

55-Yr-Old Man Dies Of Snakebite In Boudh

July 8, 2025
Breaking News

Hirakud Dam Closes Four Gates As Water Level Decreases

July 8, 2025
Next Post

Diarrhoea Cases Surge In Kalahandi Village

WATCO

H&UD Minister Stresses On Timely Project Completion During Review Of WATCO Works

Paris Olympics: Annu Rani Finishes 15th In Women’s Javelin; Kushare Fails To Qualify In High Jump

khimji
TPCODL
OMC
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ

© 2025 - Ommcom News. All Rights Reserved.