• Feedback
  • RSS Feed
  • Sitemap
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Science & Tech

ISRO Starts Assembling HLVM3 For Gaganyaan Mission’s 1st Un-Crewed Flight In 2025

OMMCOM NEWS by OMMCOM NEWS
December 18, 2024
in Science & Tech
Indian Space Research Organisation

New Delhi: Taking a major step towards the ambitious Gaganyaan human spaceflight programme, the Indian Space Research Organisation (ISRO) on Wednesday commenced the stacking of HLVM3, at the Satish Dhawan Space Centre (SDSC-SHAR) in Sriharikota.

The mission is slated for launch in 2025, and it will be the first uncrewed flight under the ambitious Gaganyaan human spaceflight programme. The data gained will be instrumental for the success of the manned missions.

The date coincides with the 10th anniversary of the LVM3-X/CARE mission, conducted on December 18, 2014.

“On the 10th anniversary of LVM3-X/CARE, ISRO begins assembly of HLVM3 for Gaganyaan’s first un-crewed flight! A major step toward India’s maiden human spaceflight and future space ambitions,” ISRO said.

“At 8.45 Hrs on December 18 at SDSC, the stacking of the nozzle end segment with full flex seal nozzle of the S200 motor took place, thus commencing the official launch campaign of the HLVM3-G1 / OM-1 mission,” it added.

During the 2014 mission, LVM3-X (which is now christened HLVM3) launched its maiden flight and “lifted a Crew Module of mass of 3,775 kg (LVM3-X/CARE mission) into a suborbital altitude of 126 km”.

Using thrusters it was oriented for a favourable re-entry, and later made a smooth splash down in the Bay of Bengal. It was retrieved by the Indian Coast Guard.

The Crew Module was developed as part of pre-project activities of the Human Spaceflight Project, well before the official Gaganyaan project was approved in 2019.

“It is a fitting coincidence that 10 years later, on the same day, ISRO is gearing up for the first un-crewed mission of Gaganyaan, by commencing the stacking of human-rated LVM3,” the ISRO said. Dr. S Somanath, Chairman of ISRO Mission was then the Director of the LVM3-X/CARE mission.

The new HLVM3, derived from LVM3, is designed with enhanced reliability to meet human safety considerations.

Importantly, to ensure crew safety it also features a Crew Escape System (CES), which is operational from the launch pad till its separation. The crew can safely eject from the Crew Module in case of an adverse situation.

“HLVM3 is a three-stage vehicle with a payload capacity of about 10 tonnes to LEO. The vehicle is 53 metres tall and weighs 640 tonnes. The vehicle is getting ready for launch with the Crew Module and associated systems undergoing final checks at ISRO centres,” ISRO said.

The LVM3-X/CARE mission’s success helped ISRO to shape the human spaceflight programme.

The space agency noted that the foundational data provided by the CARE mission was useful in developing the “iterations in the Crew Module design of the Ganganyaan mission, along with subsequent pad abort tests, air-drop tests, and test vehicle flights”.

The new Crew Module, designed with enhanced safety margins and multiple redundancies, will fly aboard the Human-rated LVM3, ensuring the safety of the Gaganyatris, ISRO said.

Further, the Gaganyaan programme will also play a vital role in the construction and operationalisation of the Bharatiya Antariksh Station (BAS).

(IANS)

Tags: GaganyaanIndian Space Research OrganisationISROSatish Dhawan Space Centre
ShareTweetSendSharePinShareSend
Previous Post

EPFO Gives Employers Final Opportunity Till Jan 31 To Upload Wage Details For Higher Pensions

Next Post

Mobile Subscriptions In India Stand At 115.12 Crore: Centre

Related Posts

Science & Tech

26 New Bacterial Species In NASA Cleanrooms To Hold Clues To Space Survival

May 13, 2025
Science & Tech

8,500 Tonnes Of Antibiotics From Human Use Contaminating Rivers Worldwide: Study

May 12, 2025
artificial intelligence
Science & Tech

AI Reinforces Importance Of Being Well-Informed

May 11, 2025
Indo-French climate satellite brought down successfully, disintegrates over Pacific(ISRo)
Nation

India’s Eye In The Sky To Get Big Boost With ISRO’s New Radar Imaging Satellite

May 11, 2025
Science & Tech

Antibiotics During Infancy Linked To Early Puberty In Girls

May 11, 2025
Fatty Liver
Science & Tech

Fatty Liver In Pregnancy May Increase Risk Of Preterm Birth

May 9, 2025
Next Post
India

Mobile Subscriptions In India Stand At 115.12 Crore: Centre

Jasprit Bumrah

WTC Standings: India Remain In Third, Aus Second After Gabba Draw; SA On Top

Dr B. R. Ambedkar

Thackeray To PM Modi: Apologise For Amit Shah's Comments On Ambedkar

Khimji
TPCODL
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • ଓଡ଼ିଆରେ ପଢନ୍ତୁ

© 2025 - Ommcom News. All Rights Reserved.