• Feedback
  • RSS Feed
  • Sitemap
Ommcom News
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Odisha

ECoR Commissions Automatic Signalling System On Cuttack–Paradeep Section

OMMCOM NEWS by OMMCOM NEWS
August 22, 2025
in Odisha

Bhubaneswar: The East Coast Railways (ECoR) has successfully commissioned a state-of-the-art Automatic Signalling System on the Cuttack–Paradeep section (83 km) of the Talcher–Paradeep Freight Corridor under Khurda Road Division. The system marks a significant milestone in the modernization of railway operations along this vital route connecting Paradeep Port.

Major Benefits of Automatic Signalling

– Higher Capacity, Faster Movement: Reduced headway between trains allows more services in less time, ensuring smoother operations.

– Enhanced Safety: Automated operations reduce human dependency, minimizing the risk of error and strengthening both passenger and freight safety.

– Improved Punctuality & Efficiency: Real-time monitoring and automatic controls support timely departures, efficient asset utilization, and better service reliability.

– Economic Growth: Faster freight movement towards Paradeep Port will boost industrial development and contribute to regional economic progress.

Key Technical Features:

Dual multi-section digital axle counters for precise train detection

Integrated power supply to ensure uninterrupted operations

LED signal lamps for clear visibility in all weather conditions

Dataloggers for comprehensive event monitoring

Video Display Units installed at all stations for real-time train supervision

Safety Upgrades

19 Level Crossing Gates now interlocked with the signalling system for safer road-rail integration

Removal of all non-interlocked gates, eliminating potential hazards

Section divided into several UP and DOWN subsections, enabling smoother traffic handling and increased line capacity

With these upgrades, the Cuttack–Paradeep section is now safer, faster, and more reliable, equipped to handle rising passenger and freight demand with modern technology.

 

Tags: East Coast Railways
ShareTweetSendSharePinShareSend
Previous Post

Bhanjanagar Police Seize Brown Sugar Worth Rs 3 Lakh, Three Arrested

Next Post

PM Modi To Unveil Rs 1,400cr-Worth Railway Projects In Gujarat On Aug 25

Related Posts

Odisha

Bhitarkanika National Park To Remain Closed For 3 Days For Crocodile Census

December 23, 2025
Diagnostic Centre - CUTTACK
Odisha

Health Dept Raids Diagnostic Centre In Cuttack, Finds No License

December 23, 2025
Odisha

Odisha CM Boosts Emergency Healthcare With Launch Of 150 New Ambulances

December 23, 2025
Odisha

Unexpected Death: Kalei Sarpanch Dies Of Heart Attack In Bhadrak

December 23, 2025
PUC Centre In Odisha
Odisha

How To Locate Nearest PUC Centre In Odisha To Get Vehicle Pollution Certificate

December 23, 2025
Odisha

CM Majhi Greets Farmers On National Farmers’ Day; Pledges Support To Farmers

December 23, 2025
Next Post
PM Modi

PM Modi To Unveil Rs 1,400cr-Worth Railway Projects In Gujarat On Aug 25

KIWSF 2025

KIWSF 2025: Madhya Pradesh Clinch All Four Golds On Day 2

Elderly Woman Murdered In Rayagada Over Witchcraft Suspicion  

Khimji
OMC
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special

© 2025 - Ommcom News. All Rights Reserved.