• Feedback
  • RSS Feed
  • Sitemap
Ommcom News
Advertisement
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special
No Result
View All Result
Odisha News, Odisha Breaking News, Odisha Latest News || Ommcom News
Home Nation

PM Modi Reviews Progress Of Bullet Train Corridor During Visit To Surat

OMMCOM NEWS by OMMCOM NEWS
November 15, 2025
in Nation
PM Modi

Surat: Prime Minister Narendra Modi on Saturday undertook a detailed review of the Mumbai–Ahmedabad High-Speed Rail (MAHSR) project during his visit to Gujarat, marking a key moment in India’s push towards next-generation transport infrastructure.

Arriving at Surat International Airport on Saturday morning, the Prime Minister proceeded by helicopter to Antroli, where the under-construction Surat Bullet Train Station — one of the flagship stations of the corridor — is taking shape.

During the visit, the Prime Minister inspected the Surat station — a structure inspired by the city’s globally renowned diamond industry.

With a height of 26.3 metres and a built-up area of 58,352 sq.mt, the station includes three levels: The ground floor for parking and security checks, the concourse level for lounges, restrooms, kiosks and ticketing, and the platform level for passenger boarding.

While structural work is complete, finishing touches such as interiors and station amenities are currently underway. Track works, including RC track-bed construction and temporary track installation, have also been completed at the site.

The visit focussed on assessing the progress of India’s first Bullet Train project, spanning 508 kms between Mumbai and Ahmedabad. Of this, 352 km lies in Gujarat and Dadra & Nagar Haveli, and 156 km in Maharashtra.

The corridor will connect major cities such as Ahmedabad, Vadodara, Bharuch, Surat, Vapi, Thane and Mumbai, and is expected to cut travel time between the two metros to around two hours, significantly boosting inter-city mobility.

According to the National High-Speed Rail Corporation Ltd. (NHSRCL), over 85 per cent of the corridor —around 465 km — is being built on elevated viaducts, with 326 km already completed.

Progress on river bridges is also substantial, with 17 of 25 bridges constructed. The 47-km Surat–Bilimora section is among the most advanced stretches, where civil works and track-bed preparation have been fully completed.

The Prime Minister’s on-site review highlights the Centre’s emphasis on expediting large-scale, high-impact infrastructure projects. Once operational, the MAHSR corridor is expected to transform regional connectivity, accelerate economic development, and place India firmly among countries with advanced high-speed rail networks.

(IANS)

Tags: PM ModiSurat
ShareTweetSendSharePinShareSend
Previous Post

Inaugural ICC Women’s Emerging Nations Trophy To Begin On Nov 20

Next Post

Rahul Gandhi In Firing Line: BJP Says Bihar Youth Rejected Macosts ‘Leaping Into Fishing Ponds’

Related Posts

Nation

Chandrababu Naidu Urges Farmers To Overcome Challenges Posed By El Nino

June 29, 2026
Nation

Assam Floods Affect Over 22,000 People; Rail Bridge Collapses Partially

June 29, 2026
Nation

NEET-UG 2026 Paper Leak Case: Delhi Court Extends Judicial Custody Of 10 Accused Till July 11

June 29, 2026
Nation

Ayodhya Police Question SBI Officials In Ram Temple Donation Embezzlement Probe

June 29, 2026
Nation

‘Pratham Puja’ Held Inside Amarnath Cave Shrine, Marks Ceremonial Start Of SANJY-2026

June 29, 2026
Nation

Mallikarjun Kharge Takes Oath As RS Member Again, Vows To Continue ‘Holding Govt Accountable’

June 29, 2026
Next Post
Narendra Modi

Rahul Gandhi In Firing Line: BJP Says Bihar Youth Rejected Macosts 'Leaping Into Fishing Ponds'

Jan Suraaj

Jan Suraaj Accuses NDA Of Buying Majority; Party Reacts To Bihar Results

Coast Guard Leads Major SAR Preparedness Exercise Off Paradip Coast    

Khimji
CUTM
SAI
  • Feedback
  • RSS Feed
  • Sitemap

© 2025 - Ommcom News. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Odisha
  • Nation
  • World
  • Sports
  • Business
  • Entertainment
  • Videos
  • Science & Tech
  • Photo Gallery
  • Odisha Special

© 2025 - Ommcom News. All Rights Reserved.